ID | Description |
---|---|
1465959 |
Updated behavior in the Event Driven HR Changes (Outbound from Dayforce) connector in Integration Studio. The updates to the connector were done to the Data Context Date field, located in Step 2. Define the parameters of this integration, in the Source section. Two choices are available for the data context date: As Of Data Effective Start and As Of Event Date. This update ensures that if the effective start date for the selected Event Type is empty when the Data Context Date is being determined, Dayforce uses the event date for the event type. The tooltip has been updated to explain this behavior, as follows: Enrich your event data with related employee data. This data will be active as of selected Data Context Date. For events with no effective start, data context date defaults to event date. |
1549923 |
Updated Integration Studio with the following MERCANS - HR Connectors:
You can view these connectors in Integration Studio by clicking Create Integration. Each of these connectors has the following specific elements: In Step 1. Name this integration, the Vendor value is read-only, and contains Mercans by default. In Step 2. Define the parameters of this integration, in the Source section, the Dayforce API contains only the Bulk Employee API option. In Step 4. Define the transmission details of this integration, the Transmission Method is not automatically populated. For general information, see the Dayforce Integration Studio Administrator Guide. |